{"product_id":"riw-aqua-channel-rodding-eye","title":"RIW Aqua Channel Rodding Eye","description":"\u003cp\u003eThe RIW Aqua Channel Rodding Eye is installed at strategic points in the perimeter drainage run to allow access for inspection, rodding to clear blockages, and maintenance of the drainage system. Current drainage design guidance and structural waterproofing standards.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBenefits\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eProvides maintenance and inspection access to the perimeter drainage system, essential for clearing blockages and verifying system performance\u003c\/li\u003e\n\u003cli\u003eRequired for BS 8102:2009 Type C system compliance, fully maintainable systems are a code requirement\u003c\/li\u003e\n\u003cli\u003ePart of the complete RIW Aqua Channel drainage system\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eGood to know\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eIt is recommended that one of these units is installed at approximately every 12 linear metres along the straight lengths of Aqua Channel\u003c\/li\u003e\n\u003cli\u003e40mm hole is cut into the top of the Aqua Channel to enable a straight connector with a removable cap and rubber seal to be solvent welded to a male coupling\u003c\/li\u003e\n\u003cli\u003eAdditional pipework may be added, if required, to suit location of inspection point.\u003cbr\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"RIW","offers":[{"title":"Default Title","offer_id":57127696728396,"sku":"BM05744","price":55.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1046\/6715\/2716\/files\/riw-riw-aqua-channel-rodding-eye-1232467534.png?v=1776258914","url":"https:\/\/www.constructionsuppliesuk.co.uk\/products\/riw-aqua-channel-rodding-eye","provider":"Construction Supplies UK","version":"1.0","type":"link"}